Skip to main content

News

  • Blankenheim Rathaus Sanierung Architekt NRW Bonn

    'Konsum' of 1738 becomes the town hall

    23. February 2021

    The listed building of the former Konsum in Blankenheim, which has been empty for 40 years, is finally being renovated. We have summarised the incredible condition of the future town hall in pictures.

  • Office meeting as video meeting from the conference room Architect Bonn

    Team meetings in times of a pandemic

    09. February 2021

    Although the majority of our team is based in a home office, we continue to hold regular office meetings, both in individual project teams and with the whole team. This allows us to continue to ensure the high quality of our services. We are also helped in this by a modern state of the art, which we constantly maintain.

  • Baustelle Grundschule Architekt Sanierung ErweiterunBuilding site elementary school architect renovation extension Bonng Bonn

    Schlossbachschule Bonn: In 3 weeks the first parts will be opened!'

    09. October 2020

    Since 2018, the elementary school in the south of Bonn is already in construction. The school, which was built in 1962 on a total area of almost 4500 square meters, is being extensively renovated and extended by a new building during ongoing operations. In three weeks everyone can now look forward to the new gymnasium and the new building with 7 classrooms.

    The remaining buildings are expected to be completed in the spring of next year and will then again be available for around 360 children in 16 classes.

    More information about the project 'Schlossbachschule'

     

  • 3d site measuring renovation monument protection architect Bonn

    3D-Aufmaß zur Sanierung unter Denkmalschutz

    25. September 2020

    With probably the most innovative, fastest and most accurate method of creating measurements, we have created a three-dimensional plan of the "Konsum" in Blankenheim, built in 1738.

    The CAD laser measurement system, which is accurate to the millimetre, not only enables us to produce a CAD drawing on site, but also allows us to pass the plans directly to our planning software, thus saving more than 75% in time. This enables us to implement particularly complicated projects much more efficiently and accurately. There are only less than 1800 devices of this type worldwide!

    The project in Blankenheim includes the renovation and conversion of the listed building at Ahrstraße 50, which has been empty for more than 20 years. In the future, the town hall of Blankenheim is to move in here.

  • Sanierung Puppenkönig Bonn Architekt

    New life for 'Puppenkönig'!

    15. September 2020

    After the company "Spielwaren-Haus Puppenkönig", founded in 1873, opened its branch in Bonn in 1913, the company announced last year that it was giving up the business.
    But there will not be a ruin: At present, renovation work is beginning on the building on Gangolfstrasse, which fortunately was hardly destroyed in the war.
    Both the old façade and the interior will be completely renovated to ensure that the new sales areas are also representative!
    A large crane was already erected yesterday for this purpose. We as architects from Bonn are allowed to plan, supervise and manage this project. We hope that we will soon be able to rummage in new shelves and displays. What will be sold there, we will reveal at a later date, e.g. via our Instagram account!

  • Neubau Bürogebäude Königswinter Architekt Bonn

    When ideas become reality: The new office and commercial building in Königswinter is nearly complete!

    14. September 2020

    For the Kuchem Konferenz Technik in Königswinter, a free-standing two-storey office and commercial building with a staggered storey is being constructed, adjacent to an existing company building.

    The new building, designed as a concrete structure, comprises two rentable full storeys with pure office use, commercial space for the client's own use, showroom/conference and break rooms as well as an open underground car park.

    More about the project

     

  • Richtfest TBK Solingen Architekt NRW Köln Bonn

    'Technisches Berufskolleg Solingen': Topping out ceremony of the new electroplating building

    14. September 2020

    On September 7, 2020, the Technical Vocational College in Solingen celebrated the topping-out ceremony of the new electroplating building which was erected as part of the "Ensuring sustainability" project. In total, the TBK will be converted, renovated or newly built at two locations in Solingen at a cost of around 12 million euros. The completion of the new electroplating building with a new chemical laboratory, four classrooms, a new waste water system and a mechanical workshop is planned for May 2021; the entire project is expected to be completed in the first half of 2022.

     

    Read more about TBK

  • Ahrstraße 50, Blankenheim, exterior view 'Am Lühberg'

    Order awarded. 'Conversion and extension of the building Ahrstraße 50, Blankenheim to use as town hall'

    06. July 2020

    New project!

    The municipality of Blankenheim plans to refurbish, convert and expand the Ahrstraße 50 building, in order to locate the town hall of the municipality at this location in the future. The building dates from 1738 and is listed. The subsequent use of the currently vacant building should enliven and enhance the inner-city area. At the same time, existing structural and functional deficits are to be remedied.

     

     

  •  Exterior view of the school in Alfter Oedekoven

    Start of construction work of Alfter Oedekoven comprehensive school

    08. June 2020

    The construction work for the reconstruction of the former Alfter Oedekoven 'Hauptschule' has started. Just in time for the school year 2022/23, the school should start as a secondary school.

  • Mission headquarters of the Franciscans moves to the upper floors of the former 'Puppenkönigs'

    Mission headquarters of the Franciscans moves to the upper floors of the former 'Puppenkönigs'

    03. May 2020

    New use after the reconstruction by Beyss Architects GmbH:
    In the spring of 2021, the international aid organization plans to move from Bad Godeberg to the former Puppenkönig building.

    Media report: Bonner Generalanzeiger> Article